Hi Expert
there is a new Requirement in process
if Materiel will be delivered in certain days within validity period of Contract , No condition type (penalty) will be fall
if Materiel will be delivered after certain days within validity period of contract , a condition type will be fall
Example
Validity period is
01.02.2014 to 10.02.2014 for 10 days
if Materiel delivered between 01.02.2014 to 07.02.2014 , no condition type (penalty) will be fall in billing
if Materiel delivered between 08.02.2014 to 10.02.2014 , a condition type (penalty) will be fall in billing by condition record
Thanks in advance